A 6 megawatt substation upgrade
Synlait's Milk Factory expansion required an upgrade of their 66kV transformer. With a short window of two-weeks, Connetics replaced the large transformer, which required a variety of our services due to the complex network environment.
View the projectLyttelton cablepull
The longest continuous cable installation in the history of Orion and Connetics and one of the longest in New Zealand.
View the projectNgā Puna Wai
Connetics installed state of the art lighting at Ngā Puna Wai sports hub.
View the projectHoon Hay switchboard replacement
Connetics upgraded Orion's 11kV oil-filled circuit breakers at Orion’s Hoon Hay Zone Substation to ABB Unigear 550 - a modern, vacuum insulated style of switchgear.
View the projectFaringdon Subdivison
Connetics were contracted to install and commission the whole of the Orion electrical reticulation network throughout the entire Faringdon development.
View the projectUpgrading Christchurch City to LED
Connetics are the proud lead designer and build contractor for the Christchurch City Council (CCC) in their drive to convert all streetlights in the city to energy-efficient LED lighting by 30 June 2021.